How does this affect you...
If
you are marketing a home off-plan, you will need to have
a PEA (Predicted Energy Assessment) in the HIP to provide
to potential buyers. Once the home is physically complete
the PEA in the HIP should be replaced with an EPC and
Recommendation Report.
Each building within a development will require its own
EPC (although reports can be cloned for identical
dwellings and will not need to be inspected
individually).
An On Construction Energy Assessor will not
need to visit the property to produce an EPC. The EPC
will be the result of the As Built check which is an
extension of the SAP calculation needed for Building
Control.
Find Out
More...
CNA
are able to offer an off-plan design consultancy service
that advises Developers and Architects in relation to
meeting the current and future insulation and
construction material U Values required to meet the
exisiting regtulations and Part L2010 due in September
2010. CNA can advise you in obtaining all neccessary On
Construction Building Energy Performance Certification
checks, anywhere within the UK.
Code For
Sustainable Homes....Working
alongside the Part L1A Regulations are those currently
named the Code for Sustainable Homes (CSH)...To find out
more and see how you can obtain a 'Nil Certificate..
please continue.
Continue..