Lily Pad Public Walkway - Nottingham

Back To the CNA Projects List

Design Contractor - CNA. Installation Contractor - L&L Installations. Main Contractor - Morgan Ashurst. Consisting of 31 lily pad designs of 95 m2 each and constructed in timber as a public boardwalk between new building construction at Nottingham Science Park. Total area is approx 3000 m2 and there are level and direction changes throughout the boardwalk construction. Completion March 2008

I Timber Engineering I Timber Boardwalks I Timber Bridges I Timber Structures I Timber Cladding I Covered Walkways I Disabled Ramps I Design I Supply & Install I On Construction EPC's I SAP Assessments I