Longstanton Bridges - Kings Oak Development.
Design & Supply Contractor - HLD Ltd. Installation Contractor - L&L Installations. Client - Cofton Ltd. Design, supply and install two Ekki Hardwood bridges 9m x 3m and 10.5m x 2m. Beams laminated softwood. Completion - May 2006
I Timber Engineering I Timber Boardwalks I Timber Bridges I Timber Structures I Timber Cladding I Covered Walkways I Disabled Ramps I Design I Supply & Install I On Construction EPC's I SAP Assessments I