Back to the CNA Projects List

Coombs valley, Leek, Staffs - New Walkway Bridge

Back To the CNA Projects List

Design & Supply Contractor - HLD Ltd. Installation Contractor - L&L Installations. Client - RSPB. Design, supply and install one pathway bridge 5.4m x 1.0 to be built on site due to difficult access and poor terrain. Completion - July 2005

I Timber Engineering I Timber Boardwalks I Timber Bridges I Timber Structures I Timber Cladding I Covered Walkways I Disabled Ramps I Design I Supply & Install I On Construction EPC's I SAP Assessments I